Some videos of the restoration work done on the boat over the first 3 years to make it both usable and liveable.
Initial look at the boat before any works took place.
Making the boat watertight
Getting the boat back up and running again
Renewing the flybridge structure
Removing the fake teak from the flybridge
Attacking the brightwork
Running the engines and generator after 5 years idle
Plumbing nightmares
Recovery of the 3 phase anchor windlass
Update after 1 year of working on the boat
Engine room portlight
Heating system upgrades to Webasto Thermotop Pro 120 24V with 90 litre water tank